Page not found

Search results

  1. Senior Affairs Committee

    Closing Remarks 10. Calendar- Next Meeting TBD (11/18/15?) in BOS Room 11. ... Television will dedicate the studio to Coleman J. Kelley at 2pm. 12. Closing Remarks 13. Calendar Next ...

    02/25/2019 - 11:33am

  2. Board of Selectmen

    and repairs of the parking and fire apparatus apron at the Robinson Road Fire Station. They compiled ...

    02/25/2019 - 11:56am

  3. Planning Board

    associated access, parking, drainage, landscape, and site lighting improvements. Hearing. Deferred Date ... a one-year extension on a previously approved proposal to construct an 8,576 sq. ft. building with a parking ... along with the associated access, parking, drainage, landscape, and site lighting improvements. Hearing. ...

    02/25/2019 - 12:04pm

  4. Planning Board

    no parking, no exterior lighting, but there would be a small sign saying AUTHORIZED TRUCKS ONLY at ... bothered by the Town’s DPW trucks and Police Department vehicles, which were supposed to go down Park ... sanitary facilities was needed. He asked where parking would occur, saying the people doing the grinding ...

    02/25/2019 - 12:04pm

  5. Invitation to Bid- HVAC Replacement

    open for acceptance for sixty (60) calendar days subsequent to submittal to the Town of Hudson or as ... Town Engineer, Elvis Dhima (edhima@hudsonnh.gov) no later than seven (7) calendar days before Hudson ... and return such signed documents to the Town, within ten (10) calendar days from the date mailed or ...

    03/29/2023 - 8:44am

  6. Planning Board

    8 Hampshire Drive SP# 10-11 Map 221/Lot 005 The purpose of this plan is to construct additional parking and ... 8 Hampshire Drive SP# 10-11 Map 221/Lot 005 Purpose of plan: to construct additional parking and maneuvering ... additional parking spaces also being added at the rear. He commented on details of changes within the site, ...

    02/25/2019 - 11:51am

  7. Conservation Commission

    under the parking lots and discharged into the wetlands after it is treated and detained. We will still ... the site walk.  P Nappo: You had a concern about the parking spaces. Are those taken care of? ...  A Basso: Yes.  J Battis: We had discussed at the site walk about the catch basin in the parking area of ...

    02/25/2019 - 11:44am

  8. Conservation Commission

    Firm: Keach–Nordstrom Associates, 10 commerce Park, Suite 3B, Bedford New Hampshire 03110 Request for ... a favorable recommendation plan has changed, to relocate building and parking lot and access point. Century ... Park has filed against Hudson ZBA for not rehearing prior decision. Being addressed new plan has less ...

    02/25/2019 - 11:55am

  9. Planning Board

    significant access, circulation, and parking improvements in order to move the main access drive to a new ... approximately 16,165 sf of additional floor area, along with significant access, circulation, and parking ... Lowell Road, Hudson, prepared by Keach-Nordstrom Associates, Inc., 10 Commerce Park North, Suite 3B, ...

    04/08/2019 - 1:03pm

  10. Sewer Utility Committee

    A.- Correspondence 1. BOS approval of flow – 25 Sagamore Park Rd. 8. Closing comments of members, if ... (-42,667) GPD since the BOS approval of the 25 Sagamore Park Road allocation. This negative number does not ... Industrial Park. B. Pipe Repair: Jess Forrence submitted to the Committee photos and a report regarding the ...

    02/25/2019 - 11:59am

Pages